Custom three‑phase smart meter automatic production line with PCBA dust removal, hi‑pot testing (4kV), semi‑auto calibration (0.05% reference), automatic sealing cap installation, and integrated aging test bench. Full traceability, MES ready. Ideal for high‑volume meter manufacturing.

Smart metering · IEC 62053

Fully Integrated Three‑Phase Smart Meter Production Line

Precision Climate-Controlled Reliability Test System for Energy Meters This Smart Meter Aging Test Bench serves as a vital piece of laboratory equipment for performing accelerated life-cycle and reliability testing (burn-in) on new and production batch energy meters. The system comprises a climate-controlled chamber capable of maintaining precise temperature (e.g., $-20^{circ}text{C}$ to $+85^{circ}text{C}$) and humidity settings, simulating extreme operating environments. Meters installed in the bench are subjected to continuous electrical loading (current and voltage) under these fluctuating environmental conditions. The bench’s advanced data logging system monitors key performance indicators, such as drift in accuracy, power consumption, and communication stability, identifying potential failures before deployment. It is indispensable for validating design robustness and ensuring compliance with utility reliability standardsEnergy meter assembly line.

Standard delivery: 60-90 days | Semi‑auto calibration | Integrated aging bench

Three phase electric meter automatic production line

Meter assembly & test line (actual product)

What is a Three‑Phase Electric Meter Automatic Production Line?

Three-phase electrical meter production line refers to the automated assembly/calibration/testing of three-phase energy meters (active/reactive/smart). The line automates the critical aspects of the production process, PCBA cleaning (dust removal) that allows for insulation integrity; automatic sealing cap installation that meets the different IP protection ratings; semi or fully automated calibration of voltage/current accuracy; and hi-pot testing; as well as having an integrated aging test bench that gives accelerated life-cycle testing under power and environmental conditions, to validate the stability and reliability of the meter’s communication over time. The line is designed to accommodate direct connected, current transformer (CT) connected and voltage transformer (VT) connected meters, as well as a number of communication modules (RS-485, PLC, RF). Each meter is fully traceable via barcode, creating a link between each meter with its test results for utility compliance (IEC 62053-11 & 22; ANSI C12). As a custom non-standard solution, we will configure the line to fit your meter dimensions, accuracy class and production volume.

Semi‑automatic calibration
Operator‑assisted high‑precision calibration of active/reactive energy.
Automated withstand voltage test
Dielectric strength (hi‑pot) up to 4kV AC, 100% in‑line verification.
PCBA dust removal & sealing
Clean boards before assembly; automatic sealing cap installation for dust/water protection.
Dedicated aging test bench
Accelerated life‑cycle test under electrical load and optional temperature/humidity.

Especificações técnicas

Complete three‑phase meter production line: dust removal, hi‑pot test, semi‑auto calibration, sealing cap assembly, aging bench. Customizable for smart meters.
Meter types supported Three‑phase four‑wire, three‑phase three‑wire; direct or CT/VT; active/reactive
Calibration method Semi‑automatic (operator assisted) with reference standard (accuracy class 0.05%)
Hi‑pot test voltage Programmable up to 4,000V AC, 1‑99 seconds, automatic pass/fail
PCBA dust removal Ionizing air blow or vacuum cleaning station, optional filtration–
Sealing cap installation Automatic press‑fit or screw‑type cap placement, torque monitoring–
Aging test bench Multi‑position chamber (up to 48 meters), programmable voltage/current cycles, real‑time accuracy monitoring–
Test coverage Basic error, start/creep, influence quantities, communication (RS485, PLC), load profile–
Sistema de controle PLC (Siemens/Mitsubishi) with HMI, recipe storage, MES interface (OPC UA)–
Rastreabilidade Barcode per meter, test data stored in SQL database, exportable to CSV–
Fonte de energia 380V ±10% 50Hz | Compressed air 0.6‑0.8MPa–

Principais vantagens técnicas

Eliminates manual calibration errors

Semi‑automatic calibration uses a precision reference standard (0.05% class) and automated adjustment of meter gains. The operator simply connects the meter; the system applies test points, calculates corrections, and verifies results – reducing human error and calibration time by 70%.

Integrated dust removal for high‑voltage safety

PCBA dust removal (ionizing air or vacuum) prevents conductive dust buildup that could cause dielectric breakdown during hi‑pot testing. This step is critical for meters operating in humid or polluted environments.

Accelerated aging without external chamber

The dedicated aging test bench applies continuous voltage/current cycles (e.g., 8 hours at rated load) while monitoring drift in accuracy and communication stability. This simulates months of field use in a single shift, catching early failures before shipment.

Full traceability for utility acceptance

Each meter’s calibration data, hi‑pot result, aging profile, and final test report are linked via barcode. Exportable audit trail satisfies utility requirements and ISO/IEC 17025 lab accreditation.

Aprovado pelos líderes do setor

ABB
DELIXI
EKF
KRIPAL
HPL
CHAC
Schneider
IEK GROUP
SUNIR
Bevone
Weg
HUYU
RAAD
WALTONE
HAVELLS
C&S electric

Customer Success Story – Utility Meter Manufacturer

A leading manufacturer of electric meters had a demand for a large increase in production of three-phase smart meters (Class 1 Active – 8,000 units/month). The existing manufacturing process required high calibration time and also had an occasional high-pot failure due to contamination on the PCBAs. Benlong delivered a complete production line with dust removal, semi-automatic calibration and integrated aging bench; within 6 months resulted in:

+150% Output (from 3,200 to 8,000 units/month)
50% Reduction in calibration labor
99.5% First‑pass yield (hi‑pot and accuracy)

The line recouped its expenses in just over a year (13 months) and met utility standards for accurate traceable (traceable to a standard) measurement.

Aplicações e Integração

Meter manufacturing plants – High‑volume production of three‑phase smart meters
laboratórios de medição de serviços públicos – In‑house production for local utilities
fabricação sob contrato OEM – Flexible line for multiple meter designs
Test & certification laboratories – Pre‑compliance testing of meter prototypes

Engenharia e entrega personalizadas

1. Meter specification review 15-30 days · meter samples, accuracy class, communication protocol
2. Process & layout design 20-30 days · 3D simulation, workstation definition
3. Fabricação 60 a 90 dias
4. Pré-gordura Na fábrica de Benlong
5. Installation & commissioning On-site 10‑15 days
6. SAT final e treinamento 5‑7 days · acceptance report

Request a Custom Three‑Phase Meter Production Line Quote

We would like to request your meter’s specifications, accuracy class, and target output so that our engineer team can start designing a custom line with features for dust removal; hi-pot testing; semi-auto calibration; sealing cap assembly; and aging bench -along with a complete ROI analysis.

Consulte agora

WhatsApp: +86 150 5837 0007 | E-mail: xsb@benlongkj.cn | Suporte em inglês e chinês

Why Choose Benlong for Meter Automation?

  • Mais de 15 anos de experiência em design. meter production and test lines for energy metering industry
  • Proven semi‑auto calibration with 0.05% reference accuracy
  • Integrated hi‑pot (up to 4kV) and aging test benches
  • Full traceability – barcode to test data, MES ready
  • Serviço global e suporte de peças de reposição

Uma linha personalizada típica inclui:

– Dust removal station for PCBA (Ionizing air and vacuum) – High-voltage (hi-pot) testing equipment – Calibration equipment (bench top) with standard reference – Automatic cap sealing equipment – Aging test equipment (multiple test locations, can accommodate up to 48 units) – Conveyor system/PLC and HMI (Siemens) – Barcode scanner and associated database – Equipment installation and associated training – 1-year parts and labor warranty on equipment

Perguntas frequentes

What is the difference between semi‑automatic and fully automatic calibration?

Operators manually connect the test leads and physically load/unload the meters when performing semi-automatic calibrations, while the calibration process itself is automated (calculating errors, checking for errors, adjusting gains, etc.). Fully automated calibration includes loading/unloading via robots and connecting to test leads automatically; this type of calibration is intended for companies that will be producing large numbers of meters (greater than 50,000 per month). Our current systems can be upgraded to mass produce meters later.

Why is PCBA dust removal necessary before hi‑pot testing?

When dust is present on a PCBA, it can form conductive pathways and can produce an erroneous dielectric breakdown failure or reduce the insulation clearance. By cleaning away any dust (with ionizing air, a vacuum, etc.), the dielectric strength test results will only reflect true insulation issues rather than any related to the dust or other contaminants.

What communication protocols does the aging test bench support?

The ageing bench records communications stability and data integrity of meters communicating via RS485 (做Modbus, DLMS/COSEM)或光學介面的IEC62056-21 (or電波無線網絡的LoRa和 NB-IOT)在需求的場合。

Can the sealing cap installation handle different cap types (snap‑fit or screw)?

Absolutely. The station has tri-change tooling for press-fit caps, screw caps or ultrasonic welding. Type of tooling changeovers takes under 30 minutes.

How long does the aging test typically take?

The range of standard aging cycles is 2 to 48 hours, according to customer specifications and meter requirements. The bench may be programmed for voltage/current ramping, load variation and temperature cycling (for an integrated environmental chamber) depending upon what is requested by the customer.

All specifications subject to final technical agreement. Benlong Automation – custom three‑phase meter production solutions for the energy metering industry.

Produtos relacionados

Indicator light automatic production line

Linha de produção automática de luzes indicadoras

Ver detalhes
Surge protection Device (SPD) Automatic Production line

Linha de produção automática de dispositivos de proteção contra surtos (DPS).

Ver detalhes
DC Charging Pile Automatic production line

Linha de produção automática de pilha de carregamento DC

Ver detalhes
MCB automatic testing line

Linha de teste automático MCB

Ver detalhes
MCCB automatic production line

Linha de produção automática de MCCB

Ver detalhes
Solid State Relay Automated Production Line

Linha de produção automatizada de relés de estado sólido

Ver detalhes

Enviar consulta

Demonstração do formulário de contato
WhatsApp
+86 150 5837 0007
Email
xsb@benlongkj.cn