{"id":83,"date":"2026-06-01T10:38:09","date_gmt":"2026-06-01T10:38:09","guid":{"rendered":"https:\/\/khkrh7q1ur.wpdns.site\/product\/load-isolation-switch-automatic-testing-line\/"},"modified":"2026-07-18T07:23:28","modified_gmt":"2026-07-18T07:23:28","slug":"load-isolation-switch-automatic-testing-line-product","status":"publish","type":"product","link":"https:\/\/benlongkj.com\/es\/load-isolation-switch-automatic-testing-line-product\/","title":{"rendered":"L\u00ednea de prueba autom\u00e1tica con interruptor de aislamiento de carga"},"content":{"rendered":"<div class=\"bl-pdp-wrapper\">\n<div class=\"bl-pdp-split\">\n<div class=\"bl-pdp-split-text\">\n<div class=\"bl-pdp-badge\">IEC 60947-3 \u00b7 Ciclo \u226428 s<\/div>\n<h1>L\u00ednea de pruebas de interruptores de aislamiento de carga totalmente autom\u00e1tica<\/h1>\n<p>Una l\u00ednea de pruebas autom\u00e1ticas para interruptores de aislamiento de carga (l\u00ednea de pruebas autom\u00e1ticas) es un sistema integrado inteligente y completo para realizar pruebas en interruptores de corte de carga y seccionadores, de conformidad con las normas GB\/T 14048.3 e IEC 60947-3.<\/p>\n<p>El sistema automatiza todo el proceso de validaci\u00f3n de la calidad, desde la carga de material hasta la inspecci\u00f3n de aspecto y dimensiones; la verificaci\u00f3n del movimiento mec\u00e1nico, la carrera y el par; las pruebas de resistencia de contacto y\/o de continuidad; las pruebas de aislamiento (alta tensi\u00f3n) y de tensi\u00f3n de resistencia; las pruebas de corriente nominal y de aumento de temperatura; las pruebas de vida \u00fatil (durabilidad electromec\u00e1nica); la validaci\u00f3n de todas las funciones auxiliares para la indicaci\u00f3n de encendido y apagado; la comprobaci\u00f3n final de la codificaci\u00f3n y la trazabilidad; y la inspecci\u00f3n del embalaje del producto.<\/p>\n<p>El sistema incluye pruebas de resistencia de bucle integrado (hasta 50 \u03bc\u03a9), prueba de alta tensi\u00f3n de CA (entre una fase y tierra), pruebas de funcionamiento mec\u00e1nico y de vida \u00fatil (m\u00ednimo 10 000 ciclos), verificaci\u00f3n del par de la manivela, as\u00ed como indicaciones de encendido y apagado y de la funcionalidad de los enclavamientos. El sistema cuenta adem\u00e1s con servomotores de alta precisi\u00f3n, cortinas de luz de seguridad y una integraci\u00f3n completa con el sistema MES, lo que permite un tiempo de ciclo por unidad de menos de 28 segundos para una sola pieza y un rendimiento en la primera pasada superior al 99,81 TP3T, con capacidad de diagn\u00f3stico remoto. El sistema cumple asimismo los requisitos para la producci\u00f3n en serie y la certificaci\u00f3n de exportaci\u00f3n de una marca global.<\/p>\n<p><span style=\"color: #2872fa; font-weight: 500;\">Entrega est\u00e1ndar: 60-90 d\u00edas | Compatible con MES | Certificado CE e IEC<\/span><\/p>\n<\/div>\n<div class=\"bl-pdp-split-media\"><img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/06\/Load-isolation-switch-Automatic-Testing-line.webp\" alt=\"L\u00ednea de prueba autom\u00e1tica del interruptor de aislamiento de carga\" \/><\/p>\n<div style=\"font-size: 11px; margin-top: 8px;\">L\u00ednea de pruebas automatizada para seccionadores (producto real)<\/div>\n<\/div>\n<\/div>\n<div class=\"bl-pdp-definition\">\n<h2>\u00bfQu\u00e9 es una l\u00ednea de pruebas autom\u00e1ticas de interruptores de aislamiento de carga?<\/h2>\n<p>Una m\u00e1quina de ensayo automatizada para interruptores de aislamiento de carga es un equipo de ensayo especial que comprueba el funcionamiento el\u00e9ctrico y mec\u00e1nico de los interruptores de carga y seccionadores de baja tensi\u00f3n utilizados en la distribuci\u00f3n el\u00e9ctrica. Los interruptores de carga y los seccionadores deben cumplir con estrictas normas de seguridad y fiabilidad (IEC 60947-3, GB\/T 14048.3). Nuestras pruebas automatizadas constan de hasta diez estaciones de ensayo secuenciales: inspecci\u00f3n visual; verificaci\u00f3n dimensional; medici\u00f3n de la carrera mec\u00e1nica y del par de accionamiento; ensayo de resistencia de contacto (microohmios); ensayo de resistencia diel\u00e9ctrica (Hi-Pot); aumento de temperatura a corriente nominal; resistencia electromec\u00e1nica (vida \u00fatil); verificaci\u00f3n de contactos auxiliares\/enclavamientos; verificaci\u00f3n final de encendido\/apagado; codificaci\u00f3n\/trazabilidad. La m\u00e1quina de ensayo utiliza servoactuadores de alta precisi\u00f3n y fuentes de corriente programables; los datos se recogen en tiempo real. Los datos registrados se env\u00edan al MES para garantizar una trazabilidad total y permitir el an\u00e1lisis SPC. Al tratarse de una soluci\u00f3n a medida, la m\u00e1quina de ensayo de interruptores de aislamiento de carga puede dise\u00f1arse espec\u00edficamente para su dise\u00f1o de interruptor, intensidad nominal (p. ej., 16 A-630 A), configuraciones de polos y especificaciones de ensayo.<\/p>\n<div class=\"bl-pdp-feature-grid\">\n<div class=\"bl-pdp-feature-card\"><strong>Prueba secuencial de 10 estaciones<\/strong><br \/>\nValidaci\u00f3n integral desde la carga hasta el envasado, totalmente automatizada.<\/div>\n<div class=\"bl-pdp-feature-card\"><strong>Resistencia de bucle \u226450 \u03bc\u03a9<\/strong><br \/>\nMedici\u00f3n de 100 A CC en cuatro hilos, precisi\u00f3n \u00b12%.<\/div>\n<div class=\"bl-pdp-feature-card\"><strong>Vida \u00fatil mec\u00e1nica \u2265 10 000 ciclos<\/strong><br \/>\nPrueba de funcionamiento con servocontrol y supervisi\u00f3n del par y la carrera.<\/div>\n<div class=\"bl-pdp-feature-card\"><strong>Integraci\u00f3n completa con el MES<\/strong><br \/>\nTrazabilidad mediante c\u00f3digos de barras, carga de datos en tiempo real, an\u00e1lisis SPC, informes electr\u00f3nicos.<\/div>\n<\/div>\n<\/div>\n<div class=\"bl-pdp-gallery\">\n<h2>Proceso de pruebas y etapas clave<\/h2>\n<div class=\"bl-pdp-gallery-grid\">\n<div class=\"bl-pdp-gallery-item\"><img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/06\/Intelligence-Visibility.webp\" alt=\"Visibilidad de la inteligencia: monitorizaci\u00f3n en tiempo real\" \/><\/p>\n<div class=\"bl-pdp-gallery-caption\">Inteligencia y visibilidad<\/div>\n<\/div>\n<div class=\"bl-pdp-gallery-item\"><img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/06\/Efficiency-Sustainability.webp\" alt=\"Eficiencia y sostenibilidad: ahorro de energ\u00eda\" \/><\/p>\n<div class=\"bl-pdp-gallery-caption\">Eficiencia y sostenibilidad<\/div>\n<\/div>\n<div class=\"bl-pdp-gallery-item\"><img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/06\/Design-Integration.webp\" alt=\"Integraci\u00f3n del dise\u00f1o - ingenier\u00eda modular\" \/><\/p>\n<div class=\"bl-pdp-gallery-caption\">Dise\u00f1o e integraci\u00f3n<\/div>\n<\/div>\n<div class=\"bl-pdp-gallery-item\"><img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/06\/Safety-Reliability.webp\" alt=\"Fiabilidad y seguridad: pruebas rigurosas\" \/><\/p>\n<div class=\"bl-pdp-gallery-caption\">Seguridad y fiabilidad<\/div>\n<\/div>\n<\/div>\n<\/div>\n<h2>Especificaciones t\u00e9cnicas<\/h2>\n<div class=\"bl-pdp-summary\">L\u00ednea de pruebas totalmente automatizada para interruptores de carga y seccionadores seg\u00fan la norma IEC 60947\u20113. Incluye resistencia de bucle, prueba de alta tensi\u00f3n, vida \u00fatil mec\u00e1nica, par de apriete, aumento de temperatura y trazabilidad MES.<\/div>\n<div class=\"bl-pdp-table-wrap\">\n<table class=\"bl-pdp-table\">\n<tbody>\n<tr>\n<th>Normas aplicables<\/th>\n<td>GB\/T 14048.3, IEC 60947\u20113<\/td>\n<\/tr>\n<tr>\n<th>Prueba de resistencia del bucle<\/th>\n<td>\u226450 \u03bc\u03a9, 100 A CC, medici\u00f3n de cuatro hilos, precisi\u00f3n \u00b12%<\/td>\n<\/tr>\n<tr>\n<th>Prueba de alta tensi\u00f3n (tensi\u00f3n de resistencia)<\/th>\n<td>Hasta 3.000 V CA (fase a fase \/ fase a tierra), duraci\u00f3n ajustable<\/td>\n<\/tr>\n<tr>\n<th>Prueba de funcionamiento mec\u00e1nico y de vida \u00fatil<\/th>\n<td>\u226510 000 ciclos, velocidad y carrera programables, control del par<\/td>\n<\/tr>\n<tr>\n<th>Verificaci\u00f3n del par de apriete de la empu\u00f1adura<\/th>\n<td>0,5-5 N\u00b7m, medici\u00f3n autom\u00e1tica, evaluaci\u00f3n de \u00abaprobado\/suspendido\u00bb<\/td>\n<\/tr>\n<tr>\n<th>Prueba de corriente nominal \/ aumento de temperatura<\/th>\n<td>Corriente programable hasta la carga nominal, control mediante termopar<\/td>\n<\/tr>\n<tr>\n<th>Tiempo de ciclo por pieza<\/th>\n<td>\u226428 segundos (incluidas todas las pruebas)<\/td>\n<\/tr>\n<tr>\n<th>Rendimiento de primera pasada<\/th>\n<td>\u226599,81 TP3T (valor t\u00edpico, depende de la calidad del producto)\u2013<\/td>\n<\/tr>\n<tr>\n<th>Integraci\u00f3n con el sistema MES<\/th>\n<td>Escaneo de c\u00f3digos de barras, carga de datos en tiempo real, an\u00e1lisis SPC, informe de pruebas electr\u00f3nico\u2013<\/td>\n<\/tr>\n<tr>\n<th>Caracter\u00edsticas de seguridad<\/th>\n<td>Cortinas de luz de seguridad, parada de emergencia, c\u00e1maras de ensayo cerradas\u2013<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h2>Proceso de prueba detallado en 10 pasos<\/h2>\n<div class=\"bl-pdp-feature-list\" style=\"margin-bottom: 24px; background: #f8fafc; padding: 20px; border-radius: 12px;\">\n<p style=\"margin-bottom: 12px; font-weight: 600;\">La l\u00ednea de pruebas automatizada ejecuta la siguiente secuencia:<\/p>\n<ol style=\"margin-left: 20px; line-height: 1.8;\">\n<li><strong>Carga de material<\/strong> \u2013 Carga autom\u00e1tica, mediante cinta transportadora o robot, de los interruptores en los dispositivos de ensayo.<\/li>\n<li><strong>Inspecci\u00f3n del aspecto y de las dimensiones<\/strong> \u2013 El sistema de visi\u00f3n comprueba si faltan piezas, si hay deformaciones y si se cumplen las dimensiones cr\u00edticas.<\/li>\n<li><strong>Movimiento mec\u00e1nico \/ Inspecci\u00f3n de la carrera y el par<\/strong> \u2013 Mide la fuerza de accionamiento, el \u00e1ngulo de carrera y el par de activaci\u00f3n\/desactivaci\u00f3n.<\/li>\n<li><strong>Prueba de resistencia de contacto \/ de continuidad<\/strong> \u2013 Medici\u00f3n de la resistencia del bucle (\u226450 \u03bc\u03a9) con 100 A de corriente continua.<\/li>\n<li><strong>Prueba de aislamiento \/ tensi\u00f3n de resistencia (hi-pot)<\/strong> \u2013 Aplica alta tensi\u00f3n de CA entre fases y entre fase y tierra; detecta fugas.<\/li>\n<li><strong>Prueba de corriente nominal \/ aumento de temperatura<\/strong> \u2013 Admite la corriente nominal durante un periodo determinado y supervisa el aumento de temperatura.<\/li>\n<li><strong>Vida \u00fatil \/ ensayo de durabilidad electromec\u00e1nica<\/strong> \u2013 Realiza hasta 10 000 ciclos mec\u00e1nicos con supervisi\u00f3n en tiempo real.<\/li>\n<li><strong>Prueba de funciones auxiliares o adicionales<\/strong> \u2013 Comprueba los contactos auxiliares y los mecanismos de bloqueo y enclavamiento.<\/li>\n<li><strong>Confirmaci\u00f3n definitiva de la funci\u00f3n<\/strong> \u2013 Comprueba la indicaci\u00f3n de encendido\/apagado y que la conmutaci\u00f3n se realice correctamente.<\/li>\n<li><strong>Codificaci\u00f3n \/ trazabilidad + inspecci\u00f3n de envases<\/strong> \u2013 Marcado l\u00e1ser del n\u00famero de serie, lectura del c\u00f3digo de barras y comprobaci\u00f3n visual final antes del embalaje.<\/li>\n<\/ol>\n<\/div>\n<h2>Ventajas t\u00e9cnicas principales<\/h2>\n<div class=\"bl-pdp-grid\">\n<div class=\"bl-pdp-card\">\n<h4>Pruebas paralelas y secuenciales de alta velocidad<\/h4>\n<p>La l\u00ednea est\u00e1 dise\u00f1ada con m\u00faltiples estaciones de prueba independientes que funcionan simult\u00e1neamente siempre que es posible (por ejemplo, resistencia de contacto, prueba de alta tensi\u00f3n, vida \u00fatil mec\u00e1nica). Esto minimiza el tiempo de inactividad y permite alcanzar un tiempo de ciclo total de \u226428 segundos por unidad.<\/p>\n<\/div>\n<div class=\"bl-pdp-card\">\n<h4>Medici\u00f3n de precisi\u00f3n de la resistencia en bucle<\/h4>\n<p>La estaci\u00f3n de resistencia de bucle utiliza una corriente de prueba de 100 A CC (conforme a los requisitos de la norma IEC 60947-3) con una conexi\u00f3n Kelvin de cuatro hilos, lo que permite alcanzar una precisi\u00f3n de \u00b12%. Esto garantiza una detecci\u00f3n fiable de conexiones sueltas o conductores de secci\u00f3n insuficiente.<\/p>\n<\/div>\n<div class=\"bl-pdp-card\">\n<h4>Prueba de resistencia mec\u00e1nica automatizada con registro del par<\/h4>\n<p>Un servoactuador realiza hasta 10 000 ciclos de encendido y apagado a una velocidad y una carrera programables. Un sensor de par integrado registra la curva de fuerza de funcionamiento, lo que permite detectar el desgaste o el atasco antes de que se produzca un fallo.<\/p>\n<\/div>\n<div class=\"bl-pdp-card\">\n<h4>Trazabilidad completa del MES para la certificaci\u00f3n de exportaci\u00f3n<\/h4>\n<p>Cada resultado de ensayo (incluidas las curvas brutas de par, temperatura y resistencia de contacto) est\u00e1 vinculado al c\u00f3digo de barras de la unidad. El sistema genera informes de ensayo electr\u00f3nicos que cumplen con los requisitos de certificaci\u00f3n para la exportaci\u00f3n (por ejemplo, CE, UL, IEC). Los paneles de control de SPC ofrecen visibilidad de la calidad en tiempo real.<\/p>\n<\/div>\n<\/div>\n<p><!-- \u5408\u4f5c\u4f19\u4f34\u6a21\u5757 --><\/p>\n<div class=\"bl-pdp-partners\"><span class=\"bl-pdp-partners-title\">Con la confianza de los l\u00edderes de la industria.<\/span><\/p>\n<div class=\"bl-pdp-partners-list\">\n<div class=\"bl-pdp-partner-item\"><img decoding=\"async\" style=\"width: 100%; height: auto; aspect-ratio: 2 \/ 1; object-fit: contain;\" src=\"\/wp-content\/uploads\/2026\/06\/1780594738413289.webp\" alt=\"TEJIDO\" \/><\/div>\n<div class=\"bl-pdp-partner-item\"><img decoding=\"async\" style=\"width: 100%; height: auto; aspect-ratio: 2 \/ 1; object-fit: contain;\" src=\"\/wp-content\/uploads\/2026\/06\/1780594739263598.webp\" alt=\"DELIXI\" \/><\/div>\n<div class=\"bl-pdp-partner-item\"><img decoding=\"async\" style=\"width: 100%; height: auto; aspect-ratio: 2 \/ 1; object-fit: contain;\" src=\"\/wp-content\/uploads\/2026\/06\/1780594739675877.webp\" alt=\"EKF\" \/><\/div>\n<div class=\"bl-pdp-partner-item\"><img decoding=\"async\" style=\"width: 100%; height: auto; aspect-ratio: 2 \/ 1; object-fit: contain;\" src=\"\/wp-content\/uploads\/2026\/06\/1780594741141751.webp\" alt=\"KRIPAL\" \/><\/div>\n<div class=\"bl-pdp-partner-item\"><img decoding=\"async\" style=\"width: 100%; height: auto; aspect-ratio: 2 \/ 1; object-fit: contain;\" src=\"\/wp-content\/uploads\/2026\/06\/1780594738593989.webp\" alt=\"HPL\" \/><\/div>\n<div class=\"bl-pdp-partner-item\"><img decoding=\"async\" style=\"width: 100%; height: auto; aspect-ratio: 2 \/ 1; object-fit: contain;\" src=\"\/wp-content\/uploads\/2026\/06\/1780594738101609.webp\" alt=\"CHAC\" \/><\/div>\n<div class=\"bl-pdp-partner-item\"><img decoding=\"async\" style=\"width: 100%; height: auto; aspect-ratio: 2 \/ 1; object-fit: contain;\" src=\"\/wp-content\/uploads\/2026\/06\/1780594738124777.webp\" alt=\"Schneider\" \/><\/div>\n<div class=\"bl-pdp-partner-item\"><img decoding=\"async\" style=\"width: 100%; height: auto; aspect-ratio: 2 \/ 1; object-fit: contain;\" src=\"\/wp-content\/uploads\/2026\/06\/1780594738797907.webp\" alt=\"GRUPO IEK\" \/><\/div>\n<div class=\"bl-pdp-partner-item\"><img decoding=\"async\" style=\"width: 100%; height: auto; aspect-ratio: 2 \/ 1; object-fit: contain;\" src=\"\/wp-content\/uploads\/2026\/06\/1780594738812289.webp\" alt=\"SUNIR\" \/><\/div>\n<div class=\"bl-pdp-partner-item\"><img decoding=\"async\" style=\"width: 100%; height: auto; aspect-ratio: 2 \/ 1; object-fit: contain;\" src=\"\/wp-content\/uploads\/2026\/06\/1780594738411369.webp\" alt=\"Bevone\" \/><\/div>\n<div class=\"bl-pdp-partner-item\"><img decoding=\"async\" style=\"width: 100%; height: auto; aspect-ratio: 2 \/ 1; object-fit: contain;\" src=\"\/wp-content\/uploads\/2026\/06\/1780594738389707.webp\" alt=\"Weg\" \/><\/div>\n<div class=\"bl-pdp-partner-item\"><img decoding=\"async\" style=\"width: 100%; height: auto; aspect-ratio: 2 \/ 1; object-fit: contain;\" src=\"\/wp-content\/uploads\/2026\/06\/1780594738361034.webp\" alt=\"HUYU\" \/><\/div>\n<div class=\"bl-pdp-partner-item\"><img decoding=\"async\" style=\"width: 100%; height: auto; aspect-ratio: 2 \/ 1; object-fit: contain;\" src=\"\/wp-content\/uploads\/2026\/06\/1780594738416677.webp\" alt=\"RAAD\" \/><\/div>\n<div class=\"bl-pdp-partner-item\"><img decoding=\"async\" style=\"width: 100%; height: auto; aspect-ratio: 2 \/ 1; object-fit: contain;\" src=\"\/wp-content\/uploads\/2026\/06\/1780594738314557.webp\" alt=\"WALTONE\" \/><\/div>\n<div class=\"bl-pdp-partner-item\"><img decoding=\"async\" style=\"width: 100%; height: auto; aspect-ratio: 2 \/ 1; object-fit: contain;\" src=\"\/wp-content\/uploads\/2026\/06\/1780594738445639.webp\" alt=\"HAVELLS\" \/><\/div>\n<div class=\"bl-pdp-partner-item\"><img decoding=\"async\" style=\"width: 100%; height: auto; aspect-ratio: 2 \/ 1; object-fit: contain;\" src=\"\/wp-content\/uploads\/2026\/06\/1780594738720809.webp\" alt=\"C&amp;S el\u00e9ctrico\" \/><\/div>\n<\/div>\n<\/div>\n<div class=\"bl-pdp-case\">\n<h3>Caso de \u00e9xito de un cliente: fabricante de aparamenta el\u00e9ctrica<\/h3>\n<p>.Los fabricantes de interruptores de corte en carga necesitaban aumentar su capacidad de ensayo entre 800 y 2500 unidades al d\u00eda. Al mismo tiempo, deb\u00edan seguir cumpliendo con la certificaci\u00f3n IEC 60947-3. Benlong pudo ayudarles suministrando una l\u00ednea de ensayo de interruptores de aislamiento de carga totalmente automatizada, compuesta por 10 estaciones integradas. Los resultados tras cuatro meses fueron los siguientes:<\/p>\n<div class=\"bl-pdp-case-stats\">\n<div class=\"bl-pdp-case-stat\"><strong>2.500 unidades por turno<\/strong> Conseguido (aumento de 210%)<\/div>\n<div class=\"bl-pdp-case-stat\"><strong>99.9%<\/strong> Repetibilidad de la prueba (Cpk \u2265 1,33)<\/div>\n<div class=\"bl-pdp-case-stat\"><strong>-80%<\/strong> Coste de mano de obra (se han sustituido 15 probadores manuales)<\/div>\n<\/div>\n<p style=\"margin-top: 12px; font-size: 14px;\">La l\u00ednea amortiz\u00f3 su coste en diez meses y proporcion\u00f3 una trazabilidad completa para una importante auditor\u00eda de homologaci\u00f3n de una empresa de servicios p\u00fablicos.<\/p>\n<\/div>\n<h2>Aplicaciones e integraci\u00f3n<\/h2>\n<div class=\"bl-pdp-feature\">\n<div class=\"bl-pdp-feature-list\">\n<div class=\"bl-pdp-feature-item\"><strong>Fabricaci\u00f3n de interruptores de corte en carga<\/strong> \u2013 Control de calidad final antes del envasado<\/div>\n<div class=\"bl-pdp-feature-item\"><strong>L\u00edneas de producci\u00f3n de seccionadores<\/strong> \u2013 Pruebas en l\u00ednea para verificar el cumplimiento de las normas IEC\/UL<\/div>\n<div class=\"bl-pdp-feature-item\"><strong>Fabricantes de equipos de conmutaci\u00f3n<\/strong> \u2013 Control de entrada y muestreo por lotes<\/div>\n<div class=\"bl-pdp-feature-item\"><strong>Laboratorios de certificaci\u00f3n<\/strong> \u2013 Ensayos de tipo y verificaciones peri\u00f3dicas<\/div>\n<\/div>\n<\/div>\n<h2>Ingenier\u00eda y entrega a medida<\/h2>\n<div class=\"bl-pdp-steps\">\n<div class=\"bl-pdp-step\"><strong>1. Revisi\u00f3n de las especificaciones del producto y de las pruebas<\/strong> 15-30 d\u00edas \u00b7 muestras de conmutadores, patrones de ensayo<\/div>\n<div class=\"bl-pdp-step\"><strong>2. Trazado de la l\u00ednea y dise\u00f1o de las estaciones<\/strong> 20-30 d\u00edas \u00b7 Integraci\u00f3n de 10 estaciones<\/div>\n<div class=\"bl-pdp-step\"><strong>3. Fabricaci\u00f3n<\/strong> 60-90 d\u00edas<\/div>\n<div class=\"bl-pdp-step\"><strong>4. Pre-FAT<\/strong> En la f\u00e1brica de Benlong<\/div>\n<div class=\"bl-pdp-step\"><strong>5. Instalaci\u00f3n y puesta en marcha<\/strong> Entre 10 y 15 d\u00edas en las instalaciones<\/div>\n<div class=\"bl-pdp-step\"><strong>6. Examen SAT final y capacitaci\u00f3n<\/strong> 5-7 d\u00edas \u00b7 informe de aceptaci\u00f3n<\/div>\n<\/div>\n<div class=\"bl-pdp-cta\">\n<h2>Solicita un presupuesto personalizado para una l\u00ednea de pruebas de interruptores de aislamiento de carga<\/h2>\n<p>Por favor, facil\u00edtenos las especificaciones de su interruptor, las normas de ensayo (IEC 60947-3\/GB\/T 14048-3) y el rendimiento previsto, para que podamos empezar a dise\u00f1ar una l\u00ednea de ensayo a medida que se adapte a sus requisitos espec\u00edficos. La l\u00ednea de ensayo incluir\u00e1 tanto ensayos de resistencia de bucle como de alta tensi\u00f3n, as\u00ed como de vida \u00fatil mec\u00e1nica, par de apriete e integraci\u00f3n con el sistema de ejecuci\u00f3n de la fabricaci\u00f3n (MES), junto con un an\u00e1lisis completo del retorno de la inversi\u00f3n (ROI).<\/p>\n<p><a class=\"bl-pdp-btn\" href=\"\/es\/contact\/\">Consulta ahora<\/a><\/p>\n<p class=\"bl-pdp-footnote\">WhatsApp: +86 150 5837 0007 | Correo electr\u00f3nico: xsb@benlongkj.cn | Soporte en ingl\u00e9s y chino<\/p>\n<\/div>\n<div class=\"bl-pdp-two-col\">\n<div class=\"bl-pdp-col-main\">\n<h3>\u00bfPor qu\u00e9 elegir Benlong para la automatizaci\u00f3n de las pruebas de conmutadores?<\/h3>\n<ul>\n<li>M\u00e1s de 15 a\u00f1os dise\u00f1ando <strong>l\u00edneas de pruebas autom\u00e1ticas<\/strong> para interruptores y seccionadores de baja tensi\u00f3n<\/li>\n<li>Pruebas integradas de 10 estaciones de eficacia probada: \u226428 segundos por unidad, rendimiento en la primera pasada del 99,81 % (TP3T)<\/li>\n<li>Resistencia de bucle de precisi\u00f3n (\u226450 \u03bc\u03a9, 100 A CC) y prueba de alta tensi\u00f3n (hasta 3 kV)<\/li>\n<li>Prueba de vida \u00fatil mec\u00e1nica (\u226510 000 ciclos) con control del par y la carrera<\/li>\n<li>Trazabilidad completa del MES: c\u00f3digos de barras, SPC, informes electr\u00f3nicos y diagn\u00f3stico remoto<\/li>\n<\/ul>\n<\/div>\n<div class=\"bl-pdp-col-side\">\n<h3>La l\u00ednea personalizada t\u00edpica incluye:<\/h3>\n<p>Dispositivos de transporte \u00b7 Lector de c\u00f3digos de barras \u00b7 Estaci\u00f3n de verificaci\u00f3n por visi\u00f3n \u00b7 Ensayos mec\u00e1nicos de par y carrera \u00b7 Ensayos de resistencia de hasta 100 A CC \u00b7 Comprobador de alta tensi\u00f3n (3 kV CA) \u00b7 Estaci\u00f3n de ensayos de aumento de temperatura \u00b7 Ensayos de resistencia en actuadores mec\u00e1nicos \u00b7 Pruebas de contactos auxiliares en disyuntores \u00b7 Dispositivo de marcado l\u00e1ser \u00b7 Controlador l\u00f3gico programable (Siemens) e interfaz hombre-m\u00e1quina (HMI) \u00b7 Protocolo de comunicaciones del sistema de ejecuci\u00f3n de fabricaci\u00f3n (MES) (OPC UA) \u00b7 Cortina de luz de seguridad \u00b7 Instalaci\u00f3n y formaci\u00f3n incluidas \u00b7 Garant\u00eda de un (1) a\u00f1o incluida.<\/p>\n<\/div>\n<\/div>\n<p><!-- \u5185\u90e8\u94fe\u63a5 --><\/p>\n<div class=\"bl-pdp-internal-links\"><span class=\"bl-pdp-internal-links-title\">Soluciones relacionadas<\/span><\/p>\n<div class=\"bl-pdp-links-list\"><a href=\"https:\/\/benlongkj.com\/es\/dc-isolating-switch-automatic-production-line-product\/\">L\u00ednea de producci\u00f3n de interruptores de aislamiento de CC<\/a><br \/>\n<a href=\"https:\/\/benlongkj.com\/es\/load-isolation-switch-automatic-testing-line-product\/\">L\u00ednea de prueba del interruptor de aislamiento de carga<\/a><br \/>\n<a href=\"https:\/\/benlongkj.com\/es\/surge-protection-device-spd-automatic-production-line-product\/\">L\u00ednea de producci\u00f3n autom\u00e1tica SPD<\/a><br \/>\n<a href=\"https:\/\/benlongkj.com\/es\/mcb-automatic-testing-line\/\">L\u00ednea de prueba autom\u00e1tica de MCB<\/a><br \/>\n<a href=\"https:\/\/benlongkj.com\/es\/mccb-semi-automatic-high-voltage-test-bench-product\/\">Banco de pruebas de alta tensi\u00f3n semiautom\u00e1tico para MCCB<\/a><br \/>\n<a href=\"https:\/\/benlongkj.com\/es\/automatic-testing-line\/\">L\u00ednea general de pruebas autom\u00e1ticas<\/a><\/div>\n<\/div>\n<h2>Preguntas frecuentes<\/h2>\n<div class=\"bl-pdp-faq-item\">\n<div class=\"bl-pdp-faq-question\">\u00bfCu\u00e1l es la diferencia entre un interruptor de carga y un seccionador?<\/div>\n<p>Un interruptor de corte en carga (tambi\u00e9n denominado interruptor de interrupci\u00f3n de carga) permite al personal operativo de una empresa el\u00e9ctrica abrir o cerrar un circuito mientras este se encuentra en estado energizado (en carga). Un seccionador o interruptor de aislamiento est\u00e1 dise\u00f1ado \u00fanicamente para establecer o interrumpir la conexi\u00f3n de un circuito cuando este no est\u00e1 energizado (sin carga); sin embargo, algunos seccionadores modernos tambi\u00e9n se han dise\u00f1ado con capacidades limitadas de interrupci\u00f3n de carga o de circuito. Nuestra l\u00ednea de ensayos permite realizar pruebas de ambos tipos de interruptores, siempre que se respeten los par\u00e1metros de ensayo correspondientes.<\/p>\n<\/div>\n<div class=\"bl-pdp-faq-item\">\n<div class=\"bl-pdp-faq-question\">\u00bfC\u00f3mo se realiza la prueba de resistencia en bucle?<\/div>\n<p>Mediante una conexi\u00f3n de cuatro hilos (Kelvin), la prueba de resistencia del bucle aplica una corriente de prueba de 100 A CC a trav\u00e9s de los contactos cerrados del interruptor. Se miden las tensiones entre los contactos cerrados del interruptor y se calcula la resistencia. Seg\u00fan la norma IEC 60947-3, el l\u00edmite aceptable para las unidades reci\u00e9n instaladas es una resistencia relativa o total \u226450 \u03bc\u03a9.<\/p>\n<\/div>\n<div class=\"bl-pdp-faq-item\">\n<div class=\"bl-pdp-faq-question\">\u00bfCu\u00e1l es la vida \u00fatil mec\u00e1nica habitual de los seccionadores?<\/div>\n<p>La norma IEC 60947-3 define una vida \u00fatil mec\u00e1nica para los disyuntores que oscila entre 1 000 y 10 000 ciclos, en funci\u00f3n de su uso. Nuestra l\u00ednea de pruebas puede realizar hasta 20 000 ciclos si es necesario; cuenta con funciones de velocidad y carrera ajustables (es decir, programables).<\/p>\n<\/div>\n<div class=\"bl-pdp-faq-item\">\n<div class=\"bl-pdp-faq-question\">\u00bfSe puede integrar la l\u00ednea de control con mi sistema de cintas transportadoras actual?<\/div>\n<p>El m\u00f3dulo se puede sincronizar con otras cintas transportadoras de montaje situadas en las fases anteriores mediante comunicaci\u00f3n de E\/S o Ethernet (Modbus TCP y Profinet). Tambi\u00e9n es posible proporcionar interfaces de transferencia personalizadas.<\/p>\n<\/div>\n<div class=\"bl-pdp-faq-item\">\n<div class=\"bl-pdp-faq-question\">\u00bfQu\u00e9 datos proporciona la interfaz MES?<\/div>\n<p>El sistema transmitir\u00e1 la siguiente informaci\u00f3n sobre cada unidad sometida a prueba: el n\u00famero de c\u00f3digo de barras, la fecha y la hora de la prueba, los resultados de la estaci\u00f3n de pruebas (incluidos la resistencia de bucle, la fuga de alta tensi\u00f3n, el par, la carrera, el aumento de temperatura, el recuento de ciclos y el estado de aprobado\/suspendido), as\u00ed como una versi\u00f3n en PDF del informe de pruebas. Puede consultar un informe de rendimiento en tiempo real y gr\u00e1ficos de tendencias en el panel de control de SPC.<\/p>\n<\/div>\n<div style=\"margin: 32px 0 16px; font-size: 12px; text-align: center; border-top: 1px solid #e9edf2; padding-top: 16px; color: #5f7d9c;\">Todas las especificaciones est\u00e1n sujetas a acuerdo t\u00e9cnico definitivo. Benlong Automation: l\u00edneas de ensayo para interruptores de aislamiento de carga que cumplen con la norma IEC 60947-3.<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>L\u00ednea de ensayo autom\u00e1tica de interruptores de aislamiento de carga seg\u00fan la norma IEC 60947\u20113. Integraci\u00f3n de 10 estaciones: resistencia de bucle (\u226450 \u03bc\u03a9, 100 A CC), prueba de alta tensi\u00f3n (3 kV), vida \u00fatil mec\u00e1nica (\u226510 000 ciclos), par de giro y aumento de temperatura. \u226428 s\/unidad, rendimiento en primera pasada del 99,81 % (TP3T), compatible con MES. Ideal para la producci\u00f3n en serie de seccionadores y la certificaci\u00f3n para la exportaci\u00f3n.<\/p>","protected":false},"featured_media":1167,"comment_status":"open","ping_status":"closed","template":"","meta":{"_acf_changed":false},"product_brand":[],"product_cat":[16],"product_tag":[],"class_list":["post-83","product","type-product","status-publish","has-post-thumbnail","product_cat-production-line-project","first","instock","shipping-taxable","product-type-simple"],"acf":[],"_links":{"self":[{"href":"https:\/\/benlongkj.com\/es\/wp-json\/wp\/v2\/product\/83","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/benlongkj.com\/es\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/benlongkj.com\/es\/wp-json\/wp\/v2\/types\/product"}],"replies":[{"embeddable":true,"href":"https:\/\/benlongkj.com\/es\/wp-json\/wp\/v2\/comments?post=83"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/benlongkj.com\/es\/wp-json\/wp\/v2\/media\/1167"}],"wp:attachment":[{"href":"https:\/\/benlongkj.com\/es\/wp-json\/wp\/v2\/media?parent=83"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/benlongkj.com\/es\/wp-json\/wp\/v2\/product_brand?post=83"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/benlongkj.com\/es\/wp-json\/wp\/v2\/product_cat?post=83"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/benlongkj.com\/es\/wp-json\/wp\/v2\/product_tag?post=83"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}