{"id":137,"date":"2026-06-01T10:38:55","date_gmt":"2026-06-01T10:38:55","guid":{"rendered":"https:\/\/khkrh7q1ur.wpdns.site\/product\/mcb-electrical-endurance-test-bench\/"},"modified":"2026-06-08T03:21:09","modified_gmt":"2026-06-08T03:21:09","slug":"mcb-electrical-endurance-test-bench-product","status":"publish","type":"product","link":"https:\/\/benlongkj.com\/es\/mcb-electrical-endurance-test-bench-product\/","title":{"rendered":"Banco de pruebas de resistencia el\u00e9ctrica para disyuntores magnetot\u00e9rmicos"},"content":{"rendered":"<div class=\"bl-pdp-wrapper\">\n<div class=\"bl-pdp-split\">\n<div class=\"bl-pdp-split-text\">\n<div class=\"bl-pdp-badge\">IEC 60898\u20111 Cl\u00e1usula 9.11 \u00b7 Resistencia el\u00e9ctrica<\/div>\n<h1>Banco de pruebas de resistencia el\u00e9ctrica para disyuntores magnetot\u00e9rmicos<\/h1>\n<p>El banco de pruebas de resistencia el\u00e9ctrica para disyuntores miniatura (MCB) es un sofisticado sistema de pruebas automatizado dise\u00f1ado para evaluar la vida \u00fatil el\u00e9ctrica y las caracter\u00edsticas de conmutaci\u00f3n de los disyuntores miniatura (MCB) en configuraciones operativas nominales, seg\u00fan las normas IEC 60898-1 (Cl\u00e1usula 9.11) e IEC 60947-2. El banco de pruebas mide la capacidad de los MCB para soportar la conexi\u00f3n y desconexi\u00f3n el\u00e9ctrica repetidas bajo una fuente de alimentaci\u00f3n I\u2099 (corriente nominal) y U\u2099 (tensi\u00f3n nominal). Durante estas pruebas, los contactos de los MCB no deben soldarse, generar arcos el\u00e9ctricos excesivos ni presentar signos de falla mec\u00e1nica.<\/p>\n<p>Un sistema de actuaci\u00f3n que puede operarse con un control preciso de tiempo y velocidad mediante servomotor con un banco de carga programable inductivo-resistivo (LR) (cos \u03c6=0,85 \u00b10,05) con factor de potencia y un PLC (Controlador L\u00f3gico Programable) que se conecta a un sistema de adquisici\u00f3n de datos (DAQ) dedicado que monitorea la ca\u00edda de voltaje de contacto, la duraci\u00f3n del arco y el aumento de temperatura en cada ciclo. Un conjunto de sensores automatizados que detecta fallas en el disparo o en la soldadura por contacto inicia una parada de seguridad. Todos los datos de prueba, incluidos los conteos de ciclos, la forma de onda de corriente y los registros de temperatura, se almacenan en una base de datos en la nube para una trazabilidad y cumplimiento completos.<\/p>\n<p><span style=\"color: #2872fa; font-weight: 500;\">Plazo de entrega est\u00e1ndar: 45-60 d\u00edas | Ciclos de prueba de hasta 20.000 | Cumple con la cl\u00e1usula 9.11 de la norma IEC 60898-1<\/span><\/p>\n<\/p><\/div>\n<div class=\"bl-pdp-split-media\">\n            <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/06\/electrical-life-test-main-image-1.png\" alt=\"MCB electrical endurance test bench\"><\/p>\n<div style=\"font-size: 11px; margin-top: 8px;\">Banco de pruebas de vida \u00fatil el\u00e9ctrica con banco de carga L-R (producto real)<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<div class=\"bl-pdp-definition\">\n<h2>\u00bfQu\u00e9 es un banco de pruebas de resistencia el\u00e9ctrica para disyuntores magnetot\u00e9rmicos (MCB)?<\/h2>\n<p>El objetivo de un banco de pruebas de resistencia el\u00e9ctrica para disyuntores miniatura (MCB) es cuantificar la vida \u00fatil de un disyuntor miniatura tras someterse a m\u00faltiples ciclos de conmutaci\u00f3n el\u00e9ctrica repetitivos. A diferencia de las pruebas de ciclo de vida mec\u00e1nico, donde el disyuntor se opera sin carga, las pruebas de resistencia el\u00e9ctrica se realizan bajo carga, aplicando la corriente y la tensi\u00f3n nominales durante cada ciclo de encendido y apagado. Esto permite probar el disyuntor miniatura de forma similar a las condiciones reales a las que se enfrentar\u00eda, como arcos el\u00e9ctricos, erosi\u00f3n de contactos y tensiones t\u00e9rmicas. Dado que es necesario para las pruebas de tipo, el control de calidad y la certificaci\u00f3n seg\u00fan las normas IEC 60898-1 (Cl\u00e1usula 9.11) e IEC 60947-2, este aparato es fundamental para el desarrollo y la certificaci\u00f3n de un MCB. Las caracter\u00edsticas t\u00edpicas de un banco de pruebas de resistencia el\u00e9ctrica para MCB incluyen un banco de carga LR programable, accionamiento servoaccionado, monitorizaci\u00f3n en tiempo real de los contactos y desconexi\u00f3n autom\u00e1tica a prueba de fallos.<\/p>\n<div class=\"bl-pdp-feature-grid\">\n<div class=\"bl-pdp-feature-card\">\n                <strong>Cl\u00e1usula 9.11 de la norma IEC 60898-1<\/strong><br \/>\n                Cumple plenamente con los requisitos de las pruebas de resistencia el\u00e9ctrica para disyuntores magnetot\u00e9rmicos.\n            <\/div>\n<div class=\"bl-pdp-feature-card\">\n                <strong>Banco de cargas programable L-R<\/strong><br \/>\n                Factor de potencia ajustable (0,85 \u00b10,05). Admite pruebas de corriente nominal y sobrecorriente.\n            <\/div>\n<div class=\"bl-pdp-feature-card\">\n                <strong>Monitoreo de contactos en tiempo real<\/strong><br \/>\n                Mide la ca\u00edda de tensi\u00f3n, la duraci\u00f3n del arco y la resistencia de contacto por ciclo.\n            <\/div>\n<div class=\"bl-pdp-feature-card\">\n                <strong>Apagado autom\u00e1tico por fallo<\/strong><br \/>\n                Detecta la soldadura por contacto o el fallo de disparo; detiene la prueba y registra el ciclo de fallo.\n            <\/div>\n<\/p><\/div>\n<\/p><\/div>\n<div class=\"bl-pdp-gallery\">\n<h2>Caracter\u00edsticas de la m\u00e1quina y proceso de prueba<\/h2>\n<div class=\"bl-pdp-gallery-grid\">\n<div class=\"bl-pdp-gallery-item\">\n                <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/06\/Intelligence-Visibility.webp\" alt=\"Intelligence Visibility - real-time monitoring\"><\/p>\n<div class=\"bl-pdp-gallery-caption\">Inteligencia y visibilidad<\/div>\n<\/p><\/div>\n<div class=\"bl-pdp-gallery-item\">\n                <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/06\/Efficiency-Sustainability.webp\" alt=\"Efficiency Sustainability - energy saving\"><\/p>\n<div class=\"bl-pdp-gallery-caption\">Eficiencia y sostenibilidad<\/div>\n<\/p><\/div>\n<div class=\"bl-pdp-gallery-item\">\n                <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/06\/Design-Integration.webp\" alt=\"Design Integration - modular engineering\"><\/p>\n<div class=\"bl-pdp-gallery-caption\">Dise\u00f1o e integraci\u00f3n<\/div>\n<\/p><\/div>\n<div class=\"bl-pdp-gallery-item\">\n                <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/06\/Safety-Reliability.webp\" alt=\"Safety Reliability - rigorous testing\"><\/p>\n<div class=\"bl-pdp-gallery-caption\">Seguridad y fiabilidad<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/p><\/div>\n<h2>Especificaciones t\u00e9cnicas<\/h2>\n<div class=\"bl-pdp-summary\">Banco de pruebas de resistencia el\u00e9ctrica conforme a la cl\u00e1usula 9.11 de la norma IEC 60898-1. Carga L-R programable, monitorizaci\u00f3n de contactos en tiempo real, parada de seguridad automatizada.<\/div>\n<div class=\"bl-pdp-table-wrap\">\n        Programable hasta <span style=\"color:#ff0000;\">20.000 ciclos<\/span> (Valor predeterminado de IEC: 4.000 o 10.000)<\/p>\n<table class=\"bl-pdp-table\">\n<tbody>\n<tr>\n<th style=\"width: 35%;\">Normas aplicables<\/th>\n<td>IEC 60898\u20111 (Cl\u00e1usula 9.11), IEC 60947\u20112<\/td>\n<\/tr>\n<tr>\n<th>Alcance de la prueba<\/th>\n<td>Resistencia el\u00e9ctrica (conexi\u00f3n\/desconexi\u00f3n) bajo corriente (I\u2099) y tensi\u00f3n (U\u2099) nominales.<\/td>\n<\/tr>\n<tr>\n<th>tipo banco de carga<\/th>\n<td>Inductivo-resistivo (L-R), programable. Factor de potencia ajustable de 0,7 a 1,0 (valor predeterminado: 0,85 \u00b10,05).<\/td>\n<\/tr>\n<tr>\n<th>Rango de voltaje<\/th>\n<td>Hasta 440 V CA (monof\u00e1sico o trif\u00e1sico, configurable)<\/td>\n<\/tr>\n<tr>\n<th>Rango actual<\/th>\n<td>6A \u2013 125A (programable, seg\u00fan la capacidad del disyuntor)<\/td>\n<\/tr>\n<tr>\n<th>Ciclos de prueba (resistencia)<\/th>\n<\/tr>\n<tr>\n<th>Sistema de actuaci\u00f3n<\/th>\n<td>Servomotorizado, velocidad de 6 a 30 operaciones por minuto (ajustable), carrera programable.<\/td>\n<\/tr>\n<tr>\n<th>Par\u00e1metros de monitorizaci\u00f3n<\/th>\n<td>Ca\u00edda de tensi\u00f3n de contacto (mV), duraci\u00f3n del arco (ms), temperatura de contacto (\u00b0C), n\u00famero de ciclos<\/td>\n<\/tr>\n<tr>\n<th>Detecci\u00f3n de fallos<\/th>\n<td>Detecci\u00f3n de contacto soldado, fallo de disparo, temperatura excesiva: apagado autom\u00e1tico + alarma<\/td>\n<\/tr>\n<tr>\n<th>Registro de control y datos<\/th>\n<td>PLC (Siemens) + HMI, m\u00f3dulo DAQ, Ethernet \/ OPC UA, exportaci\u00f3n CSV o SQL<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/div>\n<h2>Ventajas t\u00e9cnicas principales<\/h2>\n<div class=\"bl-pdp-grid\">\n<div class=\"bl-pdp-card\">\n<h4>Simulaci\u00f3n de arco del mundo real<\/h4>\n<p>            El banco de carga L-R reproduce un factor de potencia realista (0,85) y condiciones de corriente de irrupci\u00f3n, esenciales para verificar la erosi\u00f3n por contacto y el rendimiento de extinci\u00f3n del arco.\n        <\/p><\/div>\n<div class=\"bl-pdp-card\">\n<h4>An\u00e1lisis de contacto por ciclo<\/h4>\n<p>            El sistema de adquisici\u00f3n de datos de alta velocidad registra la ca\u00edda de tensi\u00f3n y la duraci\u00f3n del arco el\u00e9ctrico en cada operaci\u00f3n. El an\u00e1lisis de tendencias permite identificar la degradaci\u00f3n gradual del contacto antes de que se produzca una falla.\n        <\/p><\/div>\n<div class=\"bl-pdp-card\">\n<h4>Apagado de seguridad autom\u00e1tico<\/h4>\n<p>            Si los contactos se sueldan o el interruptor no se dispara, el sistema corta inmediatamente la alimentaci\u00f3n, detiene la actuaci\u00f3n y registra el ciclo de fallo, protegiendo as\u00ed tanto el equipo como la muestra de prueba.\n        <\/p><\/div>\n<div class=\"bl-pdp-card\">\n<h4>Informes listos para la certificaci\u00f3n<\/h4>\n<p>            Todos los resultados de las pruebas (formas de onda, registros de temperatura, recuentos de ciclos) se almacenan en una base de datos a prueba de manipulaciones, lo que genera informes listos para auditor\u00eda para los organismos de certificaci\u00f3n IEC\/UL.\n        <\/p><\/div>\n<\/p><\/div>\n<div class=\"bl-pdp-partners\">\n        <span class=\"bl-pdp-partners-title\">Con la confianza de los l\u00edderes de la industria.<\/span><\/p>\n<div class=\"bl-pdp-partners-list\">\n<div class=\"bl-pdp-partner-item\">\n                <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/06\/1780594738413289.webp\" alt=\"ABB\" style=\"width: 100%; height: auto; aspect-ratio: 2 \/ 1; object-fit: contain;\">\n            <\/div>\n<div class=\"bl-pdp-partner-item\">\n                <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/06\/1780594739263598.webp\" alt=\"DELIXI\" style=\"width: 100%; height: auto; aspect-ratio: 2 \/ 1; object-fit: contain;\">\n            <\/div>\n<div class=\"bl-pdp-partner-item\">\n                <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/06\/1780594739675877.webp\" alt=\"EKF\" style=\"width: 100%; height: auto; aspect-ratio: 2 \/ 1; object-fit: contain;\">\n            <\/div>\n<div class=\"bl-pdp-partner-item\">\n                <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/06\/1780594738101609.webp\" alt=\"CHAC\" style=\"width: 100%; height: auto; aspect-ratio: 2 \/ 1; object-fit: contain;\">\n            <\/div>\n<div class=\"bl-pdp-partner-item\">\n                <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/06\/1780594738124777.webp\" alt=\"Schneider\" style=\"width: 100%; height: auto; aspect-ratio: 2 \/ 1; object-fit: contain;\">\n            <\/div>\n<div class=\"bl-pdp-partner-item\">\n                <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/06\/1780594738797907.webp\" alt=\"IEK GROUP\" style=\"width: 100%; height: auto; aspect-ratio: 2 \/ 1; object-fit: contain;\">\n            <\/div>\n<div class=\"bl-pdp-partner-item\">\n                <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/06\/1780594738411369.webp\" alt=\"Bevone\" style=\"width: 100%; height: auto; aspect-ratio: 2 \/ 1; object-fit: contain;\">\n            <\/div>\n<div class=\"bl-pdp-partner-item\">\n                <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/06\/1780594738389707.webp\" alt=\"Weg\" style=\"width: 100%; height: auto; aspect-ratio: 2 \/ 1; object-fit: contain;\">\n            <\/div>\n<div class=\"bl-pdp-partner-item\">\n                <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/06\/1780594738361034.webp\" alt=\"HUYU\" style=\"width: 100%; height: auto; aspect-ratio: 2 \/ 1; object-fit: contain;\">\n            <\/div>\n<div class=\"bl-pdp-partner-item\">\n                <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/06\/1780594738416677.webp\" alt=\"RAAD\" style=\"width: 100%; height: auto; aspect-ratio: 2 \/ 1; object-fit: contain;\">\n            <\/div>\n<div class=\"bl-pdp-partner-item\">\n                <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/06\/1780594738314557.webp\" alt=\"WALTONE\" style=\"width: 100%; height: auto; aspect-ratio: 2 \/ 1; object-fit: contain;\">\n            <\/div>\n<div class=\"bl-pdp-partner-item\">\n                <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/06\/1780594738445639.webp\" alt=\"HAVELLS\" style=\"width: 100%; height: auto; aspect-ratio: 2 \/ 1; object-fit: contain;\">\n            <\/div>\n<\/p><\/div>\n<\/p><\/div>\n<div class=\"bl-pdp-case\">\n<h3>Caso de \u00e9xito de un cliente<\/h3>\n<p>Para llevar a cabo las pruebas de resistencia el\u00e9ctrica de la cl\u00e1usula 9.11 de la norma IEC 60898-1 para 30 disyuntores magnetot\u00e9rmicos diferentes (que van desde 6 A hasta 63 A), un laboratorio de certificaci\u00f3n internacional utiliz\u00f3 nuestro banco de pruebas de resistencia el\u00e9ctrica para disyuntores magnetot\u00e9rmicos, lo que permiti\u00f3 completarlas en 12 semanas, un ahorro de tiempo de 50% con respecto a su configuraci\u00f3n anterior.<\/p>\n<p>La monitorizaci\u00f3n automatizada del contacto y la detecci\u00f3n de fallos por ciclo les permitieron determinar que exist\u00eda un problema con el material de contacto en uno de sus prototipos, lo que les permiti\u00f3 corregir este problema antes de la producci\u00f3n.<\/p>\n<div class=\"bl-pdp-case-stats\">\n<div class=\"bl-pdp-case-stat\"><strong>12 semanas<\/strong> Campa\u00f1a de prueba completa<\/div>\n<div class=\"bl-pdp-case-stat\"><strong>30 modelos<\/strong> Tipos de MCB verificados<\/div>\n<div class=\"bl-pdp-case-stat\"><strong>100%<\/strong> Trazabilidad por ciclo de prueba<\/div>\n<\/p><\/div>\n<p style=\"margin-top: 12px; font-size: 14px;\">El banco de pruebas del laboratorio se utiliza ahora para todas las pruebas rutinarias de resistencia el\u00e9ctrica, y este m\u00e9todo de prueba ha sido acreditado como conforme a la norma ISO 17025.<\/p>\n<\/p><\/div>\n<h2>Aplicaciones y entornos de prueba<\/h2>\n<div class=\"bl-pdp-feature\">\n<div class=\"bl-pdp-feature-list\">\n<div class=\"bl-pdp-feature-item\"><strong>Laboratorios de certificaci\u00f3n IEC\/UL<\/strong> \u2013 Pruebas de tipo para la aprobaci\u00f3n del producto<\/div>\n<div class=\"bl-pdp-feature-item\"><strong>Control de calidad de fabricaci\u00f3n de MCB<\/strong> \u2013 Muestreo por lotes y verificaci\u00f3n de rutina<\/div>\n<div class=\"bl-pdp-feature-item\"><strong>Validaci\u00f3n de I+D<\/strong> \u2013 Comparar los materiales de contacto, los dise\u00f1os de la c\u00e1mara de arco y los mecanismos de resorte.<\/div>\n<div class=\"bl-pdp-feature-item\"><strong>Calificaci\u00f3n de proveedores<\/strong> \u2013 Verificaci\u00f3n entrante de mecanismos MCB de terceros<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<h2>Entrega y puesta en marcha est\u00e1ndar<\/h2>\n<div class=\"bl-pdp-steps\">\n<div class=\"bl-pdp-step\"><strong>1. Revisi\u00f3n del dise\u00f1o<\/strong> 10-15 d\u00edas \u00b7 Dise\u00f1o 3D y esquemas el\u00e9ctricos<\/div>\n<div class=\"bl-pdp-step\"><strong>2. Fabricaci\u00f3n<\/strong> 45-60 d\u00edas<\/div>\n<div class=\"bl-pdp-step\"><strong>3. Pre-GRASA<\/strong> En la f\u00e1brica de Benlong con un cliente como testigo.<\/div>\n<div class=\"bl-pdp-step\"><strong>4. Instalaci\u00f3n<\/strong> En el lugar en un plazo de 5 a 7 d\u00edas.<\/div>\n<div class=\"bl-pdp-step\"><strong>5. Entrenamiento y puesta en marcha<\/strong> Formaci\u00f3n de operadores y personal de mantenimiento<\/div>\n<div class=\"bl-pdp-step\"><strong>6. Examen final del SAT<\/strong> 7-10 d\u00edas \u00b7 informe de aceptaci\u00f3n<\/div>\n<\/p><\/div>\n<div class=\"bl-pdp-cta\">\n<h2>Solicite un presupuesto para un banco de pruebas de resistencia el\u00e9ctrica personalizado.<\/h2>\n<p>Por favor, env\u00edenos las especificaciones del disyuntor magnetot\u00e9rmico (corriente nominal, ciclo de prueba, factores de potencia) y el volumen de prueba deseado; nuestros ingenieros podr\u00e1n proporcionarle una soluci\u00f3n que cumpla con la norma IEC 60898-1, apartado 9.11.<\/p>\n<p>        <a class=\"bl-pdp-btn\" href=\"\/es\/contact\/\">Consulta ahora<\/a><\/p>\n<p class=\"bl-pdp-footnote\">WhatsApp: +86 150 5837 0007 | Correo electr\u00f3nico: xsb@benlongkj.cn | Soporte en ingl\u00e9s y chino<\/p>\n<\/p><\/div>\n<div class=\"bl-pdp-two-col\">\n<div class=\"bl-pdp-col-main\">\n<h3>\u00bfPor qu\u00e9 elegir Benlong para las pruebas de resistencia el\u00e9ctrica?<\/h3>\n<ul>\n<li>M\u00e1s de 15 a\u00f1os dise\u00f1ando <strong>Bancos de pruebas de resistencia el\u00e9ctrica para disyuntores magnetot\u00e9rmicos<\/strong> para laboratorios y f\u00e1bricas<\/li>\n<li>Tecnolog\u00eda de banco de carga L-R de eficacia probada con control preciso del factor de potencia.<\/li>\n<li>Monitorizaci\u00f3n de contactos en tiempo real (ca\u00edda de tensi\u00f3n, duraci\u00f3n del arco, temperatura)<\/li>\n<li>Apagado autom\u00e1tico a prueba de fallos: protege los equipos y las muestras.<\/li>\n<li>Registro de datos listo para auditor\u00eda: exportaci\u00f3n a SQL, OPC UA o CSV.<\/li>\n<\/ul><\/div>\n<div class=\"bl-pdp-col-side\">\n<h3>El sistema est\u00e1ndar incluye<\/h3>\n<p>Mecanismo de apertura y cierre accionado por servomotor<br \/>\nBanco de carga LR programable (incluye ajuste del factor de potencia)<br \/>\nPLC de alta velocidad (Siemens) + M\u00f3dulo de adquisici\u00f3n de datos<br \/>\nPantalla t\u00e1ctil HMI<br \/>\nSensores de medici\u00f3n de ca\u00edda de tensi\u00f3n de contacto<br \/>\nMonitorizaci\u00f3n de la temperatura (termopares)<br \/>\nRecinto de seguridad con parada de emergencia<br \/>\n1 juego de accesorios MCB (1P\/2P\/3P\/4P)<br \/>\nCertificaci\u00f3n de calibraci\u00f3n<\/p>\n<\/p><\/div>\n<\/p><\/div>\n<div class=\"bl-pdp-internal-links\">\n        <span class=\"bl-pdp-internal-links-title\">Soluciones relacionadas<\/span><\/p>\n<div class=\"bl-pdp-links-list\">\n            <a href=\"https:\/\/benlongkj.com\/es\/mcb-mechanism-life-test-bench-product\/\">Banco de pruebas de vida \u00fatil del mecanismo MCB<\/a><br \/>\n            <a href=\"https:\/\/benlongkj.com\/es\/mcb-automatic-testing-line\/\">L\u00ednea de prueba autom\u00e1tica de MCB<\/a><br \/>\n            <a href=\"https:\/\/benlongkj.com\/es\/mcb-long-time-thermal-calibration-bench-product\/\">Banco de calibraci\u00f3n t\u00e9rmica de larga duraci\u00f3n MCB<\/a><br \/>\n            <a href=\"https:\/\/benlongkj.com\/es\/mcb-semi-automatic-thermal-trip-calibration-bench-type-a-product\/\">Banco de calibraci\u00f3n de disparo t\u00e9rmico de MCB<\/a><br \/>\n            <a href=\"https:\/\/benlongkj.com\/es\/iot-smart-mcb-automatic-production-line-product\/\">L\u00ednea de producci\u00f3n de disyuntores inteligentes IoT<\/a>\n        <\/div>\n<\/p><\/div>\n<h2>Preguntas frecuentes<\/h2>\n<div class=\"bl-pdp-faq-item\">\n<div class=\"bl-pdp-faq-question\">\u00bfCu\u00e1l es la diferencia entre las pruebas de vida \u00fatil mec\u00e1nica y el\u00e9ctrica para los disyuntores magnetot\u00e9rmicos?<\/div>\n<p>Las pruebas de las caracter\u00edsticas mec\u00e1nicas de los interruptores autom\u00e1ticos eval\u00faan el mecanismo sin aplicar corriente el\u00e9ctrica mediante ciclos mec\u00e1nicos; esto solo verifica que la resistencia mec\u00e1nica tanto del interruptor como del resorte puedan soportar dichos ciclos. Las pruebas de resistencia el\u00e9ctrica a la corriente y tensi\u00f3n nominales especificadas para cada ciclo someten los contactos a arcos el\u00e9ctricos\/erosi\u00f3n y estr\u00e9s t\u00e9rmico. Nuestras pruebas de resistencia el\u00e9ctrica sirven como ejemplo del cumplimiento de este requisito seg\u00fan la cl\u00e1usula 9.11 de la norma IEC 60898-1.<\/p>\n<\/p><\/div>\n<div class=\"bl-pdp-faq-item\">\n<div class=\"bl-pdp-faq-question\">\u00bfQu\u00e9 factor de potencia se requiere para las pruebas de resistencia el\u00e9ctrica seg\u00fan la norma IEC?<\/div>\n<p>Seg\u00fan la cl\u00e1usula 9.11 de la norma IEC 60898-1, las cargas inductivas deben tener un factor de potencia entre 0,85 y 0,90. En nuestras instalaciones disponemos de una carga de resistencias inductivas variables (LR) que puede ajustarse a 0,85 o a otro valor, seg\u00fan se requiera.<\/p>\n<\/p><\/div>\n<div class=\"bl-pdp-faq-item\">\n<div class=\"bl-pdp-faq-question\">\u00bfEl banco de trabajo se detiene autom\u00e1ticamente si se sueldan los contactos?<\/div>\n<p>El sistema de prueba actual supervisa las tensiones de contacto y la continuidad del circuito. Si se produce un fallo al abrirse (soldar) o dispararse, la prueba se detiene, se activa una alarma y se registra el ciclo de fallo.<\/p>\n<\/p><\/div>\n<div class=\"bl-pdp-faq-item\">\n<div class=\"bl-pdp-faq-question\">\u00bfCu\u00e1ntos ciclos de prueba puede realizar el banco de pruebas de forma continua?<\/div>\n<p>El banco de pruebas ha sido dise\u00f1ado para funcionar las 24 horas del d\u00eda, los 7 d\u00edas de la semana. El ciclo de prueba est\u00e1ndar (durabilidad) es de 20\u00a0000 ciclos (la Comisi\u00f3n Electrot\u00e9cnica Internacional \u2013 IEC exige 4000 o 10\u00a0000, seg\u00fan el tipo de disyuntor). El sistema registra todos los datos autom\u00e1ticamente y puede pausarse o reanudarse cuando sea necesario.<\/p>\n<\/p><\/div>\n<div class=\"bl-pdp-faq-item\">\n<div class=\"bl-pdp-faq-question\">\u00bfPuede el banco de pruebas probar simult\u00e1neamente disyuntores magnetot\u00e9rmicos tripolares?<\/div>\n<p>S\u00ed. El banco de pruebas es capaz de soportar interruptores autom\u00e1ticos con configuraciones de 1P, 2P, 3P y 4P, lo que permite que los interruptores autom\u00e1ticos multipolares tengan el mecanismo de actuaci\u00f3n configurado para activar todos los polos de forma s\u00edncrona y proporcionar una monitorizaci\u00f3n independiente para cada polo.<\/p>\n<\/p><\/div>\n<div style=\"margin: 32px 0 16px; font-size: 12px; text-align: center; border-top: 1px solid #e9edf2; padding-top: 16px; color: #5f7d9c;\">\n        Todas las especificaciones est\u00e1n sujetas a la aprobaci\u00f3n t\u00e9cnica final. Benlong Automation ofrece soluciones de pruebas de resistencia el\u00e9ctrica que cumplen con la cl\u00e1usula 9.11 de la norma IEC 60898-1 desde 2010.\n    <\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Banco de pruebas de resistencia el\u00e9ctrica para disyuntores magnetot\u00e9rmicos Benlong, conforme a la cl\u00e1usula 9.11 de la norma IEC 60898-1. Carga L-R programable (PF 0,85), monitorizaci\u00f3n en tiempo real de la ca\u00edda de tensi\u00f3n de contacto y del arco el\u00e9ctrico, y apagado autom\u00e1tico en caso de soldadura por contacto. Ideal para laboratorios de certificaci\u00f3n y control de calidad en la fabricaci\u00f3n de disyuntores magnetot\u00e9rmicos.<\/p>","protected":false},"featured_media":136,"comment_status":"open","ping_status":"closed","template":"","meta":{"_acf_changed":false},"product_brand":[],"product_cat":[20],"product_tag":[],"class_list":["post-137","product","type-product","status-publish","has-post-thumbnail","product_cat-test-bench-project","first","instock","shipping-taxable","product-type-simple"],"acf":[],"_links":{"self":[{"href":"https:\/\/benlongkj.com\/es\/wp-json\/wp\/v2\/product\/137","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/benlongkj.com\/es\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/benlongkj.com\/es\/wp-json\/wp\/v2\/types\/product"}],"replies":[{"embeddable":true,"href":"https:\/\/benlongkj.com\/es\/wp-json\/wp\/v2\/comments?post=137"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/benlongkj.com\/es\/wp-json\/wp\/v2\/media\/136"}],"wp:attachment":[{"href":"https:\/\/benlongkj.com\/es\/wp-json\/wp\/v2\/media?parent=137"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/benlongkj.com\/es\/wp-json\/wp\/v2\/product_brand?post=137"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/benlongkj.com\/es\/wp-json\/wp\/v2\/product_cat?post=137"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/benlongkj.com\/es\/wp-json\/wp\/v2\/product_tag?post=137"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}